The prices increase in parallel with the progress of the works, do not wait any longer to buy your lots at better prices and better locations.
Possibility of direct credit from the seller.
Information: immo.paraiso.tropical@gmail.com or WhatsApp +51 992 510 305
Construction begins June 15, 2018
Change of agricultural land to urban land, building permit and registration of 214 lots in the cadastre and with titles in the public register.
¡No esperes más para comprar tus lotes a los mejores precios y las mejores ubicaciones!
Construction begins June 15, 2018 Change of agricultural land in urbanization, building permit and registration of 214 lots in the cadastre and the public register. Area of work: kitchen, bedrooms and bathrooms.
3 km of drainage canals for rapid evacuation of rainwater, dry the soil and lower the water table by 1.50 m.
Machine purchases: Excavator, backhoe, dumpster, minivan And purchases of materials: metal formwork, scaffolding, 90 tonnes of electrically welded mesh, 32,000 m2 of membrane for swimming pools, 3,000 m2 of membrane for stretch ceilings…. Hangar of 400 m2 for materials and machines + 106 m2 of offices
We have 1.6 km of roads and 1.4 km of electrification.
Construction of the 25,000 m2 lagoon, the island and the leveling of the giant nightclub.
Medium voltage connection 22,900 volts for the project
Private park of the condominium of 5100 m2, with a swimming pool of 600 m2 with island and beach, football fields, volleyball, tennis, pétanque, gymnasium, changing rooms, bathrooms, table games, space for private events.
600 m2 swimming pool of the residential club.
At the end of 2019 we are at 30% of the progress of works
OPENING HOURS END 2021
Commercial land sold 8, available 60
Residential land sold 34, available 101
Contact: immo.paraiso.tropical@gmail.com
Paraíso Tropical 2026 | www.elhostingperu.com | Hosting para WordPress en Perú.